The students in charge of this project started by taking inventory of the existing Uninterruptible Power Supplies (UPS) and the device that is connected to them. The goal of this project was to remove some existing UPSs and install new ones. The students used four existing UPSs and added nine new UPSs to the server room. Critical devices got their own UPSs. During the installation process the students had to label or correct the labels for the devices which are plugged in to the UPS. Next the students upgraded the rack map and made a new list showing which power strips the new UPSs were connected to.
Student Team Members: Aleksander Sterkin, Mousa Jari