A Not-For-Profit requested a network infrastructure build. The student on this project first installed 594 feet of Cat6 and Cat5e cables. The also installed and configured a router as well as installed an antenna to broadcast the wireless signals.
Student Team Members: Kashif Rauf, Mark Mitchell, and Tom Zender