Ghost Build

The client for this project was one of the university instructors who needed one of the computer lab classrooms set up for an event.  The project team needed to create a build that could be pushed to the workstations within the specific lab classroom.  A Windows XP image was used to satisfy the requirements.  Once…

Ghost Build Test

Students involved in this project tested workstations to make sure the image that was pushed to them for an event.  All the proper software installed and was functioning.  Student Team Members: Kyle Gardner, RickWilburn, Ian Bazilio

Nagios Monitoring Server

At the start of this project the goal was to upgrade the operating system and the core.  While trying to accomplish this, the hard drive crashed which then forced the student to make the decision to virtualize this server.  Project Student: Chris Kulaga

PEN Mobile Server Setup

This project involved the PEN which is a mobile server with four different operating systems in it.  It consists of various Cisco products also such as, router, switch, firewall, and VPN.  The goal of this project was to establish it as an Intranet with the ability to connect to other networks to perform network scans….

Indiana Company Phased Infrastructure Recommendation

The goal of this project was to create a plan to guide the client in updating their infrastructure.  The student provided a report to the client that advocated a phased approach to replacing their network.  This approach allowed the client to replace in phases as their budget allowed.  Project Student: Rick Wilburn

Professor Assistance

The client for this project was a professor that was needing software installed on the machines within one of the university department computer labs.  The student downloaded the requested software to the ghost image for the following week and then tested out the software to make sure it was properly functioning.  Project Student: Twila Dowell

SNORT

The desired outcome of this project was to create an Intrusion Detection System(IDS) using SNORT.  The student installed SNORT on several machines but encountered many problems.  This project was assigned near the end of the semester so the student documented progress for project continuation the following semester. Project Student: Rick Wilburn

Sharepoint

The goal of this project was to turn the SharePoint Server into a Microsoft Office SharePoint Server 2007 server.  The student researched several available options for the installation.  The student created backups on the server that were sent to a different server.  A few issues surfaced and were waiting to be resolved before installing.  Project…

Teaching High School Students

This project consisted of teaching high school students how to  make learning fun.  The student showed the high school students how to create a wireless router antenna booster.          Student Team Members: Twila Dowell, Mark Mitchell