This project occurred in the basement of a university building within one of the computer testing labs utilized by the university department.  During the course of this project the students dealt with Cisco routers, Cisco switches, patch panels, and HP switches.  The team labelled these cables and connected them from the Cisco router and connected HP switches to the patch panels.

 Student Team Members: Ahmed Al Guqhaiman, Milton Plummer

Author