During the course of this project the students collected IT equipment from other buildings and transferred it to the new construction site. A design also was made for some of the labs that will be within the new buildings. During the design process, cable management was thoroughly thought over to ensure the best practice. When the construction got to a certain point, we were able to implement or design and begin the set up phase. Before moving the equipment in, it was carefully cleaned. Also during this project the cables for the computers were organized to keep them away from the users.
Student Team Members: Abdullah Abumouzah, Abdullah Alyousif Ali Zubayd, Michael McWhirter, Steven Roll, Thavarin Krouch